An Embankment Made Of Clinker From LSR Group Was Built In Vyborg

An Embankment Made Of Clinker From LSR Group Was Built In Vyborg
An Embankment Made Of Clinker From LSR Group Was Built In Vyborg

Video: An Embankment Made Of Clinker From LSR Group Was Built In Vyborg

Video: An Embankment Made Of Clinker From LSR Group Was Built In Vyborg
Video: Cement (1940-1949) 2024, May
Anonim

An embankment with bike paths, a beach, a gym and observation platforms appeared on the Smolyany Cape in Vyborg. The sidewalk on the embankment is lined with clinker produced by LSR Group.

zooming
zooming

This cape is part of the Vyborg Bay coastline, a favorite vacation spot for locals and tourists. The project of its improvement was chosen by the townspeople during an open vote. In the process of work, an outdoor gym was opened here, a beach was equipped, observation and selfie platforms, parking were organized, a unified system of pedestrian and transport links was formed, including a pedestrian promenade and a bike path.

zooming
zooming

In the future, the improvement project involves the development of yachting and water tourism. In particular, it is planned to build a new berth for small vessels here.

zooming
zooming

The total area of the improvement was 5 hectares, the length of the renovated embankment is 900 m.

Recommended: