Is It Worth Overpaying For A Custom Home Project?

Table of contents:

Is It Worth Overpaying For A Custom Home Project?
Is It Worth Overpaying For A Custom Home Project?

Video: Is It Worth Overpaying For A Custom Home Project?

Video: Is It Worth Overpaying For A Custom Home Project?
Video: Top 10 MOST Profitable DIY Home Projects (Easy Money) 2024, April
Anonim
zooming
zooming

Is saving a country house or summer cottage justified without a project? In fact, the legislation of the Russian Federation does not regulate the design and construction of residential buildings up to 3 floors in height. Therefore, developers often draw a sketch by hand, starting the construction of the foundation and other work. But this is the most common mistake, as the savings on a quality project then translate into unforeseen expenses. If you have already decided to build a reliable and comfortable home, then use a well-designed project.

The decision that the project is needed has been made. Now it remains to understand which option is suitable - typical or individual. Typical projects are cheaper, individual ones are more expensive. Is it worth overpaying? To get an answer to your question, let's talk about the benefits of each option.

Benefits of typical projects

The site of the DOM4M company presents many typical reusable projects, developed specifically for these purposes. The main advantage of this option is its affordable cost. But in pursuit of cheapness, pay attention to high-quality project documentation. There are several key points of analysis:

  • rational use of the area;
  • thoughtful layout;
  • harmonious proportions of architecture;
  • strength and environmental friendliness of the building.

To assess the rationality of distribution, divide the share of living space by the total area, excluding the garage, utility rooms, basement. The closer the number is to one, the better the food. Rationality is especially important for small buildings, where every square meter counts.

If desired, you can make changes to a typical project. But this opportunity is available when purchasing project documentation directly from the author here. You will be able to directly discuss details, change the size of individual rooms, details in architecture.

The obvious advantages include time saving. After the selection of the project documentation, it is linked to the client's conditions. This will take no more than 1.5-2 months.

What is custom design?

If the budget allows and there is a desire, then together with architects and engineers, you can develop a project from scratch. With an individual design, all your personal requests and wishes will be taken into account. But you will have to pay more for this. Complex design from scratch will take at least 2.5-3 months. Much depends on the speed of the customer agreeing on space-planning solutions.

The overpayment is also justified by the fact that the documentation is developed for specific climatic, geological and topographic conditions of a particular site. Engineers take into account the type of soil, temperature indicators, terrain, cardinal directions, the desired view from the window, and much more. The client chooses the number of storeys, area, room arrangement. The finished building has an original look, and the interior space meets the needs of a particular person.

Recommended: